Compliance Glossary for Confluence

How do I create an enterprise baseline?

Production version 6 lets an administrator initiate an enterprise baseline from Terminology Baseline. Under Create enterprise freeze, select scanned spaces, set retention, and choose Prepare and queue freeze. The server prepares, queues, captures, verifies, and promotes only complete evidence. Deployment is confirmed. Forge staging qualification and production capacity, cost, and residency evidence remain incomplete.

Last verified against production v6 · 26 September 2026

At a glance

InputActionOutputLimit
Production version 6Open Terminology BaselineBaseline page with legacy and enterprise sectionsDeployment is confirmed. Forge staging qualification remains incomplete.
Completed scan evidenceSelect Governed spacesScope for source preparation and captureChoose 1–50 listed spaces. Every space needs at least one complete scan row
Retention requirementSet Retention class, Retain until, and optional Legal holdA retention policy stored with the freezeRetention class and date are required. The organization remains responsible for its lawful retention decision.
Selected scopeSelect Prepare and queue freezeA pinned glossary snapshot, source counts, and seven capacity estimatesAll selected scan rows must share one glossary snapshot. Missing, malformed, or mixed scan evidence stops preparation.
Accepted preparationQueue the freezeA persisted job and a bounded queue referenceCapacity rejection creates no job and emits no queue event.
Queued responseDisplay approved-term and scanned-page countsQueue confirmationThe current UI does not poll the new job or expose cancellation.
Approved terms and matching page revisionsRun bounded captureFrozen meanings, artifacts, revisions, hashes, usages, findings, and membership recordsEach delivery processes at most 100 source units. A changed live page revision fails the job.
Complete persisted evidenceVerify counts, checksums, root hash, and snapshotA promoted current baseline pointerIncomplete evidence, drift, count mismatch, or failed verification blocks promotion
Create terminology baselineSelect Create baselineLegacy baseline workflowThis is not the enterprise freeze path and remains enabled during migration
250,000-artifact harnessRun a deterministic local simulationRecovery and modeled resource evidenceIt is not Forge capacity evidence and does not represent 250,000 Confluence pages

How it works

  1. Confirm the installed app is production version 6 and exposes Enterprise evidence workspace.
  2. Complete a terminology scan for every space in the evidence scope.
  3. Open Terminology Baseline. Do not use Create baseline for an enterprise freeze.
  4. Under Create enterprise freeze, select the required Governed spaces.
  5. Enter Retention class and Retain until. Select Legal hold when policy requires it.
  6. Select Prepare and queue freeze. Wait for the queued confirmation and source counts.
  7. Treat this message as queue confirmation. The current UI does not poll the new job or expose cancellation.
  8. After the promoted baseline becomes current, reopen Terminology Baseline and inspect Frozen meanings and revisions.

Example

A medical technology team needs a fixed evidence point before an external review. Its administrator selects quality and product spaces with one shared scan snapshot. The server admits the workload and captures matching evidence. It verifies counts, checksums, and the root hash before promoting the baseline pointer.

What this does not mean

Production version 6 was deployed on 2026-09-26. The current qualification bundle still lacks Forge staging latency, consumption, cost, residency, and capacity evidence. The current page initiates a freeze but does not poll or cancel the returned job. The legacy Create baseline path remains enabled. The 250,000-artifact result is a local mixed-data simulation, not a page-capacity result. Baseline creation does not approve releases, execute signatures, certify compliance, or replace a QMS.

Related questions

Next step

Confirm production version 6 and the enterprise workspace. Then start with one scanned space and a documented retention decision. View Compliance Glossary on Atlassian Marketplace.

View on Atlassian Marketplace
Verification basis: production v6 code, tests, manifest, and operations guidance. Verified 26 September 2026.